ECAD Implementation Case Study <Aiden Co., Ltd.>
Achieving innovation through IWS (I-DEN Wiring Solution) with wiring measurement functionality.
In the past, manufacturing sites used boards with nail wiring for wiring measurement and processed electrical wires. Additionally, wiring information was created on-site from drawings, and experienced workers were essential for the tasks. Moreover, when mistakes in the drawings were found on-site, it led to rework after correcting the drawings, significantly impacting delivery times. However, after the introduction of this product, verification of drawings, measurement, and consideration of wiring routes can now be done in advance on a PC, eliminating mistakes on-site. What surprised us after the implementation was that even workers who joined this year could perform wiring for control panels without being able to interpret circuit diagrams. The combination of this product and the Wiring Monitor (a monitor equipped with touch functionality) has proven that anyone can perform tasks in a short time while ensuring a certain level of quality. 【Implementation Effects】 ○ Reduced mistakes on-site and achieved shorter delivery times ○ Non-skilled workers can perform wiring for control panels while ensuring a certain level of quality *For more details, please refer to the PDF document or feel free to contact us.
- Company:ECADソリューションズ
- Price:Other